Why is a Sewage Sludge
Utilization Permit necessary?
The purpose of the Sewage Sludge Utilization Permit is to protect the public health and ground water by assuring that septic waste is properly handled and disposed of.
When do I need a Sewage
Sludge Utilization Permit?
A Sewage Sludge Utilization Permit must be obtained by any person or company engaged in the business of cleaning and emptying septic tanks, holding tanks, privies, or other sewage disposal facilities.
What is the Sewage Sludge
Utilization Permit application process?
A completed application and fee must be submitted by the applicant.
Conditions of Approval
The application will be reviewed for compliance with current standards and, if the application is acceptable, an inspection of the sludge hauling truck will be scheduled.
Appeal Information
If a permit is denied, an appeal may be made to the Chief of the Division of Land Development Services in this department. If the appeal is denied based on County law, the denial may be appealed to the Montgomery County Board of Appeals. If the denial is based on State law, an
appeal may be made to the Maryland Department of the Environment.
Inspection Information
Inspections of sludge hauling trucks are required annually. The trucks must be properly lettered and at least one-half full of clean water at the time of inspection. Sludge hauling truck inspections are done at the Well and Septic office and must be
scheduled in advance. The applicant will also need to specify an acceptable disposal site, and if that site is at a Washington Suburban Sanitary Commission (WSSC) facility, the proper WSSC approval must be provided to the inspector. Please call the Well
and Septic Section at (240)777-6320 for more information.
Other Agencies Involved
The WSSC should be contacted at 301-206-8000
for information about permits for disposing of septage into their facilities.
What will the Sewage
Sludge Utilization Permit cost?
Septage Hauler permit fee per truck (new or renewal) is $231.00.
The above fee includes a 10% Automation Enhancement Fee.
When will I receive
my Sewage Sludge Utilization Permit?
Once a permit application has been approved, a Sewage Sludge Utilization Permit will be issued after a truck inspection has been completed, and a waste discharge location has been authorized. A Sewage Sludge Utilization Permit number must be lettered
on a vehicle in accordance with regulations before a vehicle may be allowed to operate. Permit processing time may vary due to workload factors/project complexity.
Permit Duration
All permits expires on January 31st of each calendar year, regardless of when it was issued during the preceding year.
SEWAGE SLUDGE UTILIZATION PERMIT PROCESS AT A GLANCE
|